Water Resources Eng

DEVELOPMENT DAM PROJECT ON THE RIVER ARROR

Arror River passes throw Gishu highland in vicinity of Kapswar County flowing Arror Fall to Kairo River in Rift Valley .This valley is the Longest in African continent and it is famous in the world. The difference in height between Dam site and deepest point in the Rift Valley is 1200 meters. The Dam site is located in 75 Km North East far from Eldoret city and 250 Km North West of Nairobi-Kenya

With construction of an Earth Core Rock fill Dam - ECRD - Dam and with Height of 93m and foundation at 2175 meters above sea level the reservoir volume would be 64 Million Cubic Meters. The water will flow throw series of pressurized pipes named Penstock with a length of 5 KM which partly would be installed in an access tunnel to downhill and powerhousae. Water by passing through the three Turbine generators, Pelton type, with an output of 60 MW will flow to the a Daily Regulating Pond with a volume 50000 Cubic meters. It generates 157 GWh guaranteed annual energy

Name of contract: Consultancy services for Khalifian Dam and irrigation network and Environmental and Social Impact Assessment and resettlement action plan studies

Country: Iran

In 2007, with the aim of controlling floods in Khalifan River, Godarchay branch, and supplying drinking water to the cities of Mirabad, Ajmaloo and Mehmandar, and supplying water to more than 600 hectares of agricultural lands around flood control and disposal studies, river route improvement and feasibility studies based on information. Meteorology, hydrology, seismicity and seismic risk assessment, geology and geotechnics of the region began. After complete examinations by the company's experts, the location and type of the dam will be located on the Khalifan River, 1 km away from Mirabad city, in the form of a pebble earthen dam with a clay core with a height of 30 meters, a width of 200 meters and a reservoir volume of 2 million cubic meters. designed. Construction of the dam began in 2011 and was ready to open in 2014

Date of award: June, 2007
Date of completion: Sept,2009
Duration: 25 months

Name of contract: Consultancy services for Baleghchi Dam and irrigation network and Environmental and Social Impact Assessment and resettlement action plan studies

Country: Iran

 Studies on the dam began in 2008. It was decided to start dam studies in order to supply part of the drinking water of Naghadeh city and to supply agricultural water for more than 3,000 hectares of downstream agricultural lands, as well as to prevent the occurrence of dangerous floods in the past. According to the conditions, Hydraulic Experts in Naqsh Tarsim Milad (NTM) desgined Earth-filled Balqachi dam with height of 20 meters and width of 400 meters and reservoir volume of 12 million cubic meters at a distance of 2 km upstream of Naghadeh city. The construction of the dam began in 2013 and ended in 2016. The dam now serves as an effective source of water supply for agricultural and drinking needs and to prevent floods and human and financial damage to the people of Naqadeh

Contract role ( check one): Sole Consultant
Date of award: March, 2008
Date of completion: June, 2010
Duration: 14 months

Name of contract: Engineering, procurement and construction of plant design supply and installation of wastewater transmission line and treatment plant of Birjand city

 Country: Iran

 The implementation of 10 km sewer pipelines with 400 mm diameters, pump stations and wastewater treatment Birjand. Plant system: Activated sludge

Contract role(check one): JV partner of a joint venture
Date of award: January, 2015
 Date of completion: Feburary,201
JV partner duration(years and months): 36 months

Name of contract: Construction Operation, Procurement & Installation of Electro Mechanical Equipment, Instrumentation of Ardabil Sewage Treatment Plant

Country: Iran

Nature of works and special features relevant to the contract for which the applicant wishes to prequalify:  Construction operation, procurement & installation of electro mechanical equipment, instrumentation & 6 months operation of development module of Ardabil treatment plant. Development plan of sewage treatment plant of Ardabil city 96000 m3/day capacity with SBR system

Contract role ( check one): JV partner of a joint venture
Date of award: February,2017
Date of completion: June, 2020
Duration: 36 months

Name of contract: Construction of D9 Flow-through Dam, Channel & Related Facilities 

Country: Iran 

Earth dam and pebble dike with total volume 500,000 m3 / Evacuation conduits including two 1200 mm lines total length 400 meters / Spillways and other concrete structures with total volume of 6000 m3 / Height from foundation (meters) : 40 / Length of crown (meters): 1000 / Crown width (meters): 10 / Total reservoir volume (million cubic meters): 20 / Conveyance Channel (meters): 1200 / Permanent access road (Km): 5.3

Contract role ( check one): A partner of a joint venture
Date of award: January, 2017
Date of completion: June, 2019
JV partner duration: 24months

Name of contract: EPC for Bahmanshir Circular Cellular Dam and water supply for Abadan and Khoramshar cities and Environmental and Social Impact Assessment and resettlement action plan studies

 Country: Iran

Detailed design and supervision of Bahmanshir Circular Cellular Dam, located on Bahmanshir River, in south west of Iran. This dam was located downstream of Mared Dam at the beginning of Bahmanshir River (16 m height, 150 m crest length, and 11 m cell diameter). Salinity control of Bahmanshir River and supply drink and irrigation water demands for 750 ha of Abadan and Khorramshahr cities (about 500,000 people) are the main aims of this project

Contract role ( check one): JV partner of a joint venture
Date of award: August, 2006
Date of completion: June, 2009
JV partner duration: 23 months

Name of contract: Consultancy services for Goletappeh Dam and irrigation network and Environmental and Social Impact Assessment and resettlement action plan studies

Country: Iran

Feasibility studies of Goletappeh earth dam of about 20 m height, 300 m length and 9 million cubic meter capacity to secure the water requirements of areas downstream and to mitigate flood effects and irrigation water demands 270 ha

Contract role ( check one): Sole Consultant
Date of award: March, 2009
Date of completion: March, 2010
Duration: 14 months

Feasibility Study Of Khalifian Short Dam

Employer: Western Azarbayjan Regional Water Joint-Stock Company
Project position: Naghadeh county-Western Azarbayjan province Iran (X:543353,Y:4083390)
Starting date: February 2007
Completion date:February 2010
Dam height: 20 m
The crest level of the dam: 140 m from sea level

First stage studies on Khalifian short embankment dam are being carried out to control floods and to prevent from damage of spring floods to Khalifian village and also to set and save some output of Khalifian River for agricultural and drinking usages. The predicted place for constructing Khalifian short dam is located in six kilometers from east-south of the county Naghadeh, the province, Western Azarbayjan. The basin area of this dam is located in the south of the lake Urumiyeh, with the area 11.8 and the perimeter 15.4 km. The river Khalifian is one of the branches of the river Godarchay and its average annual output is about 3 million.

Feasibility and Detailed Studies of Gol-Tappeh embankment dam

Employer: Western Azarbayjan Regional Water Joint-Stock Company
Starting date: April 2009
(Completion date: Feasibility (September 2010
Dam height : 20 m

Reservoir volume : 19.2 milion
According to this project, saving and bringing up seasonal floods to date become possible by constructing a short dam across Cham-Sounias River. Furthermore, constructing a dam across this river plays an important role in controlling the region's flood in addition to saving water.The highest mountains in the west of Cham-Sounias River are Belar khoyah and Gardah-Dowlak mountains with the heights 2235 and 2219 m, respectively. Of course, the highest mountains of this region are Gorg-Halalan and Khader-Sharafan mountains in the west-south of the county Piranshahr, with the heights 3000 to 3100 m from sea level and Iran-Iraq borderline is in the ridge of these mountains. This region is a semiarid region with cold winters and mild summers. This basin area is located in the west-south of Urmiah sea with the area 343  and the perimeter 93 km