Construction of D9 Dam

Name of contract: Construction of D9 Flow-through Dam, Channel & Related Facilities

Country: Iran

Earth dam and pebble dike with total volume 500,000 m/ Evacuation conduits including two 1200 mm lines total length 400 meters / Spillways and other concrete structures with total volume of 6000 m/ Height from foundation (meters) : 40 / Length of crown (meters): 1000 / Crown width (meters): 10 / Total reservoir volume (million cubic meters): 20 / Conveyance Channel (meters): 1200 / Permanent access road (Km): 5.3

Contract role ( check one): A partner of a joint venture
Date of award: January, 2017
Date of completion: June, 2019
JV partner duration: 24months